Annual Issue 48 – 2014
Abstracts:
- From the 300-year-old iron pipes at the UNESCO World Heritage Site to the concepts of today – a lasting infrastructure for water management
- The renaissance of the metallic sealing gate Valve in the drinking water sector
- Butterfly valves “Made in Germany”
- New sewage pipeline in ductile cast iron on the Bachweg in Seon
- Replacement of the Schwarzbachtal waste water authority’s DN 800 and DN 1000 sewage pipeline between Bernau and the sewage treatment plant
- Construction of a new drinking water supply Pipeline between Pödelwitz and Neukieritzsch
- Construction of a new drinking water connecting Pipeline from the Ramstein pumping station to the Dackenheid water tower
- Construction of a new DN 500 main supply Pipeline from HB Bromberg to Holzgerlingen
- Status analysis for the piping network of the city of Vienna using non-damage-based data on ductile iron pipes
- Renewable energy in the land of the fjords – high Performance application of ductile iron pipes for hydroelectric power stations
- Small hydroelectric power plant at Ossasco, in the Bedretto valley
- Hydroelectric power station in Nauders, Tyrol has gone into operation
- Trenchless replacement of a fire main using the burst lining technique
- 100 kilometres of ductile iron driven piles for the CSP power station – KaXu Solar One – in South Africa